Click here to learn more produce
| Working Dimension (L*W*H) (mm) |
3600*3400*6700 |
| Shipping status Dimension (L*W*H) (mm) |
6200*2100*2300 |
| Vehicle weight (kg) |
7500 |
| Engine power (Cummins) (kW) |
97 |
| The maximum torque of the walking motor (N.m) |
5600 |
| The impact drill has the maximum torque of the rotating motor (N.m) |
1500~2500 |
| The rotary pile drill has the maximum torque of the rotating motor (N.m) |
3100~8000 |
| The auger has the maximum rotating torque (N.m) |
3100~8000 |
| Maximum piling height (mm) |
6000 |
| Piling stroke (mm) |
5500 (once) |
| Impact drilling depth (mm) |
5500 (once) |
Impact drill diameter (mm)
|
50~300 |
| Spiral drilling diameter (mm) |
90~300 |
Spiral drilling depth (mm)
|
5000 |
| The angle of supine adjustment of the mast (°) |
10 up and 90 Down |
| The front and rear adjustment angle of the mast (°) |
Front 20 Rear 20 |
Hydraulic system pressure (Mpa)
|
18~22 |
Hydraulic system flow (triple pump) (L/min)
|
160 |
Walking speed (km/h)
|
>2.5 |
Hydraulic hammer model (standard)
|
YC360 |
Hydraulic hammer impact energy (J)
|
1200-1800 |
Climbing slope (°)
|
>30 |
1️⃣ Prepare the Site: Clear the working area and check ground conditions, access routes, and underground utilities before operation.
2️⃣ Position the Machine: Move the pile driver to the designated area and make sure the chassis is stable.
3️⃣ Inspect the Equipment: Check the engine, hydraulic hoses, oil levels, piling mast, pile clamp, and other key components.
4️⃣ Load the Pile: Place the selected foundation pile into the holding mechanism and secure it according to the manufacturer's instructions.
5️⃣ Align the Pile: Adjust the mast and positioning system to match the required pile location and alignment.
6️⃣ Start Piling: Operate the hydraulic system to drive the pile into the ground until the specified installation depth is reached.
7️⃣ Check the Result: Inspect the pile's position, verticality, and installation depth before moving on to the next location.
☆ Powerful Hydraulic System: Delivers the driving force required for efficient foundation pile installation.
☆ Improved Working Efficiency: Mechanized piling helps shorten construction time, especially on large-scale projects.
☆ Flexible Configuration: Different chassis types and optional attachments can be selected to suit site conditions and project needs.
☆ Wide Pile Compatibility: Supports various pile profiles commonly used in solar mounting and construction projects, depending on the machine model.
☆ Stable Performance: A robust structure helps ensure controlled and reliable operation during piling work.
Q1: What types of piles can a hydraulic pile driver install?
A: Depending on the model, it can install C-shaped, U-shaped, H-shaped steel piles, and other compatible foundation piles.
Q2: Can the machine work in hard soil?
A: Some models can be equipped with drilling attachments for pre-drilling in hard or compacted soil. However, rocky ground may require specialized equipment.
Q3: How do I choose the right hydraulic pile driver machine?
A: Consider the pile type and dimensions, soil conditions, required installation depth, project size, working environment, and expected daily output.
Q4: What information is needed to get a quotation?
A: Please provide the pile profile and dimensions, required installation depth, soil conditions, project location, and expected working capacity. These details will help determine the most suitable machine model and configuration.